This is the summary of basic requirements to be met by sites contributing to LCG - Tier1 and/or Tier2. The original document can be found at LCG Wiki. In addition, VO-specific requirements may be provided.

Baseline services

  • VOBoxes
    • for each experiment (ALICE, ATLAS, CMS)
  • LFC (or a compatible solution)
    • a service per VO is probably needed
  • FTS
    • also is probably needed per VO; relies on Oracle DB server currently
  • SRM
    • Castor2, dCache or DPM (or a compatible solution)
  • 3D project
    • Oracle server instances: hardware, software, administrative support
  • Other services:
    • for gLite only: RB, BDII, RGMA etc

Connectivity to other sites

  • Connection to T0
    • dedicated network
  • Connections to other T1s
    • FTS channels, probably (not necessarily) dedicated network
  • Connections to affiliated T2s
    • FTS channels, public networks

Operations

  • Adequate human resources
  • Adequate infrastructure (safety, cooling, power supply etc)
  • For Tier1: 24/7 on-call system